Saturday, 26 October 2013

Quality and Supply Chain Management IP3

Weekly tasks or assignments (Individual or Group Projects) will be due by Monday and late submissions will be assigned a late penalty in accordance with the late penalty policy found in the syllabus. NOTE: All submission posting times are based on midnight Central Time.
Put together a PowerPoint presentation with 12–15 slides that can be used for both internal purposes and when you meet with all of your vendors to kick off a vendor certification program. To earn full credit on the PowerPoint, you must use colored slides, clip art or charts, or photos on each slide to make them eye-appealing, along with 150–200 words of speaker notes for each slide, explaining the slide's content. Slides must not be covered with commentary; that is what the speaker notes are for.
Assume the following information about a company:
·         The company is currently assessing a make versus buy decision.
·         The company currently makes product line "A" using proprietary technology. Its variable cost/unit is $10, and its fixed cost allocation of overhead based on producing 10,000/yr is $20/unit, for a total standard cost of $30/unit.
·         The company also makes 3 other completely different and separate product lines on different equipment.

·         The company has a quote from an outside vendor for this product A, for $18/unit.

No comments:

Post a Comment